Public Engagement Overview
What We’ve Done
Community Involvement during Planning and Early Implementation
350+ stakeholder meetings during the Master Plan conceptual phase.
100+ community events hosted or attended by Inspire Dallas since April 2024.
What’s Ahead
Dual Focus on Design Input and Pre-Construction Inclusion
Design Input: Gather community feedback to inform final design.
Subcontractor Outreach: Ensure inclusive participation ahead of pre-construction.
Concept 15: The Selected Site Plan
Between 2021 and 2024, the KBHCCD Master Plan team evaluated over 16 realignment and expansion options. After rigorous analysis, Concept 15 (“Bent Bar”) was selected as the only option that meets all critical requirements and minimizes risk.
Concept 15 delivers:
750,000 SF of contiguous exhibit space
Direct connectivity to the Omni Hotel
Protection of PFZ funding
Construction feasibility with minimal right-of-way conflicts
Operational continuity throughout construction
Reconnection of Downtown, the Cedars, and South and Southern Dallas
Feasibility to host FIFA 2026 International Broadcast Center
Deconfliction with TxDOT and Union Pacific rail lines
Enables future expansion