top of page

Public Engagement Highlight

260120 Interiors 4-1 copy.jpg

Bird
Safety

260120 Interiors 4-1 copy.jpg

You Said

Bird friendly glass needs to be a priority

260120 Interiors 2-1 copy.jpg

Active Uses

260120 Interiors 2-1 copy.jpg

You Said

Convention Center District to feel lively and welcoming

6Q4A6649.JPG

Pedestrian and Bicycle

6Q4A6649.JPG

You Said

Walkability and stronger bicycle connections

6Q4A5891.JPG

Public Transit

6Q4A5891.JPG

You Said

Safer, welcoming, better connected-transit desired

IMG_4739.HEIC

Neighborhood
Connectivity

IMG_4739.HEIC

You Said

The site feels disconnected from neighborhood 

Curated sets

Change the text to include your own content. Adjust the font, size or scale to customize the style.

260120 Interiors 4-1 copy.jpg

I-30 CLOSES, DETOURS BETWEEN I-35E, I-45/US 75 IN DALLAS STARTING JANUARY 30

DALLAS - Weather permitting, all lanes of east and westbound I-30 will be closed between the i-35E and i-45/US 75 interchanges from 10 p.m. Friday, January 30 to 5 a.m. Monday, February 2 as part of the ongoing I-30 Canyon corridor improvement project.

A signed detour will be in place to use the SH 366/Woodall Rodgers Freeway as an alternate east-west connection between I-35E and I-45/US 75 during this time. Other alternate routes may result in increased travel distance.

Significant delays can be expected; avoid unnecessary travel in the area if possible. Plan ahead for extra travel time and be alert to slower or stopped traffic.

i-30-canyon-detour-map-jan-16_crop.jpg
Lamar St Map.jpg

As a reminder, the following traffic impacts are in place as part of this project and are weather permitting: 

  • All lanes of Cesar Chavez Boulevard are closed and detoured at I-30 through late 2028.

  • All lanes of Cadiz Street are closed and detoured at I-30. It will be rebuilt on a new alignment and reopen later in the project.

  • All lanes of Akard Street are closed and detoured at I-30 through summer 2028.

  • Good Latimer Expressway is narrowed to one lane in each direction at I-30 through early 2028.

  • Signed detours to adjacent streets are in place for the closures at Cesar Chavez Blvd., Cadiz St. and Akard Street.

  • Drivers should plan ahead for extra travel time. No pedestrian access is allowed inside the closed work zones.

This is part of the $888 million I-30 Canyon project between the I-35E and I-45 interchanges. Overall completion is expected in late 2030/early 2031, weather permitting. Future scheduled lane and ramp closures for this project will be posted in www.DriveTexas.org as information becomes available.

For everyone's safety, TxDOT urges drivers to use caution in work zones by setting aside distractions, following posted speed limits and being alert to slower traffic and crews in the area.

Past Traffic Alerts

  • From TxDOT:

    Weather permitting, all lanes of east and westbound I-30 will be closed between the I-35E and I-45/US 75 interchanges from 10 p.m. Friday, January 16 to 5 a.m. Monday, January 19 as part of the ongoing I-30 Canyon corridor improvement project. 

    A signed detour will be in place to use the SH 366/Woodall Rodgers Freeway as an alternate east-west connection between I-35E and I-45/US 75 during this time. Other alternate routes may result in increased travel distance. 

    • Significant delays can be expected; avoid unnecessary travel in the area if possible. Plan ahead for extra travel time and be alert to slower or stopped traffic.

    • This same weekend closure and detour is expected to be scheduled again later this month; details will be provided once finalized.

     

    The following traffic impacts are also scheduled as part of this project: 

    • All lanes of Cesar Chavez Boulevard will be closed and detoured at I-30 from 9 p.m. Monday, January 12 through late 2028, weather permitting.

    • All lanes of Cadiz Street will be closed and detoured at I-30 starting at 9 p.m. Tuesday, January 13. It will be rebuilt on a new alignment and reopen later in the project.

    • All lanes of Akard Street will be closed and detoured at I-30 from 9 p.m. Tuesday, January 13 through summer 2028, weather permitting.

    • Good Latimer Expressway will narrow to one lane in each direction from 9 p.m. Tuesday, January 13 through early 2028, weather permitting.

     

    Signed detours will be in place for the closures at Cesar Chavez Blvd., Cadiz St. and Akard Street. Drivers should plan ahead for extra travel time. No pedestrian access is allowed inside the closed work zones.
    This is part of the $888 million I-30 Canyon project between the I-35 and I-45 interchanges. Overall completion is expected in late 2030, weather permitting. Future scheduled lane and ramp closures for this project will be posted in www.DriveTexas.org as information becomes available. 
    For everyone's safety, TxDOT urges drivers to use caution in work zones by setting aside distractions, following posted speed limits and being alert to slower traffic and crews in the area.

  • On January 21, the Kay Bailey Hutchison Convention Center Dallas (KBHCCD) Master Plan team briefed Dallas City Council on anticipated roadway closures and corresponding detour routes related to upcoming infrastructure work.

    The maps below illustrate primary and combined detour routes that may be used during various phases of construction, including weekday conditions before and after FIFA-related activities. Routes are shown for traffic entering Downtown from The Cedars, South and Southern Dallas, and Oak Cliff, along with anticipated traffic volumes and future viaduct configurations.

    These detour routes are provided for public awareness and planning purposes and will be updated as construction phasing progresses by TxDOT, FIFA and KBHCDD.

    Screenshot+2026-01-22+at+1.05.51 PM.webp
    Screenshot+2026-01-22+at+1.06.19 PM.webp
    Screenshot+2026-01-22+at+1.05.41 PM.webp
    Screenshot+2026-01-22+at+1.05.58 PM.webp
  • DALLAS - Weather permitting, all lanes of east and westbound I-30 will be closed between the I-35E and I-45/US 75 interchanges from 10 p.m. Friday, January 30 to 5 a.m. Monday, February 2 as part of the ongoing I-30 Canyon corridor improvement project. 

    Picture1.webp
    • A signed detour will be in place to use the SH 366/Woodall Rodgers Freeway as an alternate east-west connection between I-35E and I-45/US 75 during this time. Other alternate routes may result in increased travel distance. 

    • Significant delays can be expected; avoid unnecessary travel in the area if possible. Plan ahead for extra travel time and be alert to slower or stopped traffic.

       

      As a reminder, the following traffic impacts are in place as part of this project and are weather permitting: 

    • All lanes of Cesar Chavez Boulevard are closed and detoured at I-30 through late 2028.

    • All lanes of Cadiz Street are closed and detoured at I-30. It will be rebuilt on a new alignment and reopen later in the project.

    • All lanes of Akard Street are closed and detoured at I-30 through summer 2028.

    • Good Latimer Expressway is narrowed to one lane in each direction at I-30 through early 2028.

      Signed detours to adjacent streets are in place for the closures at Cesar Chavez Blvd., Cadiz St. and Akard Street. Drivers should plan ahead for extra travel time. No pedestrian access is allowed inside the closed work zones.

      This is part of the $888 million I-30 Canyon project between the I-35E and I-45 interchanges. Overall completion is expected in late 2030/early 2031, weather permitting. Future scheduled lane and ramp closures for this project will be posted in www.DriveTexas.org as information becomes available.

      For everyone's safety, TxDOT urges drivers to use caution in work zones by setting aside distractions, following posted speed limits and being alert to slower traffic and crews in the area.

    To sign up for future work zone email alerts on this project! Visit tinyurl.com/2hemz3dh

Past Traffic Advisories

I-30 Canyon Corridor Improvement Project

From TxDOT:

Weather permitting, all lanes of east and westbound I-30 will be closed between the I-35E and I-45/US 75 interchanges from 10 p.m. Friday, January 16 to 5 a.m. Monday, January 19 as part of the ongoing I-30 Canyon corridor improvement project. 

A signed detour will be in place to use the SH 366/Woodall Rodgers Freeway as an alternate east-west connection between I-35E and I-45/US 75 during this time. Other alternate routes may result in increased travel distance. 

  • Significant delays can be expected; avoid unnecessary travel in the area if possible. Plan ahead for extra travel time and be alert to slower or stopped traffic.

  • This same weekend closure and detour is expected to be scheduled again later this month; details will be provided once finalized.

 

The following traffic impacts are also scheduled as part of this project: 

  • All lanes of Cesar Chavez Boulevard will be closed and detoured at I-30 from 9 p.m. Monday, January 12 through late 2028, weather permitting.

  • All lanes of Cadiz Street will be closed and detoured at I-30 starting at 9 p.m. Tuesday, January 13. It will be rebuilt on a new alignment and reopen later in the project.

  • All lanes of Akard Street will be closed and detoured at I-30 from 9 p.m. Tuesday, January 13 through summer 2028, weather permitting.

  • Good Latimer Expressway will narrow to one lane in each direction from 9 p.m. Tuesday, January 13 through early 2028, weather permitting.

 

Signed detours will be in place for the closures at Cesar Chavez Blvd., Cadiz St. and Akard Street. Drivers should plan ahead for extra travel time. No pedestrian access is allowed inside the closed work zones.
This is part of the $888 million I-30 Canyon project between the I-35 and I-45 interchanges. Overall completion is expected in late 2030, weather permitting. Future scheduled lane and ramp closures for this project will be posted in www.DriveTexas.org as information becomes available. 
For everyone's safety, TxDOT urges drivers to use caution in work zones by setting aside distractions, following posted speed limits and being alert to slower traffic and crews in the area.

Tue, Mar 10
Location is TBD
  • Tue, Mar 10
    Location is TBD
    Mar 10, 2026, 7:00 AM – 11:00 AM
    Location is TBD
  • Mon, Mar 16
    Dallas
    Mar 16, 2026, 7:00 PM – 11:00 PM
    Dallas, Dallas, TX, USA
bottom of page